All Azarakhsh Technology Pyramid Company sell and buy offers

  • Electricity grid connection plan - licen...

    Power plant installation and commissioning (dispersed generation generators)\r\n\r\nWith a doctorate in electrical engineering, I have enough experience in the field of installing and operating gas (GAS Engine-Turbine), wind and solar power plants, as well as obtaining permits for DG power plants, both fossil and new energy.\r\n\r\n Power plant connection plan to the grid (studies of connection to the grid of solar and renewable gas power plants)\r\n\r\nA number of previous experiences in the field of carrying out the grid connection plan: studies of the connection plan to the electricity gri ...

    • 9 Year
  • Design and solar justification and licen...

    The Islamic Republic of Iran has planned for the fifth development plan of 5,000 megawatts of renewable energy. So far, only about 100 MW of renewable power plants, both wind and solar, have been installed in the country. Interestingly, in the fourth development plan, 2000 megawatts of renewable electricity were anticipated, which for some reason was not realized. In this regard, we decided to develop a comprehensive plan for the construction of a solar power plant with extensive studies and the work aspects of the work that will continue to serve. Solar energy is one of the sources of renewa ...

    • 9 Year
  • Studies, defense passive, and risk-power...

    Studies, defense, passive power plant and feasibility studies, telecommunications, power plants and DG and small scale CHP and CCHP تبیین goals and general policies of passive defense check the status of the area plan, from the perspective of zoned land/region/province - - - check the status of the area plan, from the perspective of spatial defense national/regional/provincial - - - effects of mutual proximity is the vital installations. sensitive and important - - - report of general geology and seismicity of the region بررسی situation, public security and local options)proximity to the ...

    • 9 Year
  • Plan, connection to the electricity grid...

    1. Simulation of a solar power plant, and the characteristic voltage-current of the cell under the temperature and radiation variables, and plan the solar power plant and plan technical and financial solar power plant 2. Ruth How to layout and connect the array of series/parallel according to the specifications of the inverter of choice and variety of configurations available to select اینورترها 3. Modeling of solar cell and inverter in DIgSilent and PV Syst and do a broadcast load studies short circuit 4. How to protect and select the key/relay/fuse in either the DC and AC settings and ...

    • 9 Year
  • Consulting services in DG, CHP, CCHP and...

    DGSolar offers technical consulting services to support a wide range of industry stakeholders including product developers, third-party owners (leasing / PPA companies), investors of new products and business ventures (technical due diligence), market research and reporting. Business development and go-to-market strategies Product development and system integration with solar PV based on existing / tested energy storage technologies Cash flow analysis, leasing / financing strategies, rate analysis, demand charge savings modeling, sales origination & proposals Product & system research, dev ...

    Price: 100 dgsolar.ir
    • 9 Year
  • Sale of microturbine gas turbine generat...

    Motor Sich PAES-2500 Gas Turbine Power Generating Unit Mobile gas turbine PAES 2500 Motorsich Co 2500 kW electric power 24%: electrical efficiency 80%: simultaneous production efficiency 5800 kilowatts: output thermal power 50 Hz: frequency Natural gas network: type of fuel 11.52.5 3.7 Dimensions (length, width and height) 28,500 kg Weight -50 to 45 degrees Celsius Working temperature conditions 30,000 hours Duration between basic repairs 570 degrees Celsius Output temperature from the gas turbine of this engine-generator is in a mobile package with all electrical and mech ...

    Price: 2 IRT
    • 9 Year
  • Connection scheme of the solar power net...

    The Islamic Republic of Iran to plan the fifth development of 5000 MW of renewable energy planning in the society. While so far only close to the 100 MW power plant renewal پذبر ranging from wind and solar in the country, the installation is. Ironically, in the fourth Development Plan of the time of 2000 MW of renewable electricity forecast was that for some reason did not materialize. In this regard, it came up with extensive studies and review aspects of executive work, a plan comprehensive in order to construct solar power plants formulate that in the continuation of service offered. انرژی ...

    • 9 Year
  • A variety of power plants, electrical

    For the production of electricity from plants generating electricity can be used . This plant has several types as described below . 1 - power plant diesel 2 - gas power plant 3 - the power plant heater 4 - combined cycle power plant 5 - Hydro-Electric Power 6 - the nuclear power plant 7 - the power plant pumped storage o 8 - solar power plant 9 - power plants, inflatable 10 - geothermal power plants, 11 - hydropower, tidal نیروگاه diesel : in this type of power plant, the propulsion generator is a combustion engine with diesel supply . Today, from power plants, diesel as a power ...

    • 9 Year
  • The plant in Qom

    Combined cycle power plant in Qom in order to supply part of the electrical energy of the country and also strengthen the sustainability of the network and improvement of voltage drop, especially in the central part of the national network and also reduce the energy losses in the land area of 220 hectares in 15 km of road of Qom – Arak has been constructed . contract the construction of this power plant in the history of 9/2/69 between the company, Regional, Tehran, Iran affiliated to the Ministry of energy and heavy industry company میتسو our Messenger Japan has concluded . The plant consist ...

    • 9 Year
  • Telecom and SCADA between electrical sub...

    - Introduction: به because of the extensiveness of the network of interconnected production and transmission in the electricity industry and the scattering of the stations in the points, sometimes out of reach, launching and roughing telecommunication systems of the basic needs of the industry, the electricity industry. Land uses major telecommunication in the electric power industry include : 1 - the transfer of information and send commands auto-protective to isolate sections of injured and defective in the shortest time and avoid the extensiveness of the minor accidents to the entire networ ...

    • 9 Year
  • The airport's electrical جابهار solar po...

    2-1 airport Chabahar This airport from the limited possibilities and is due to the air base, Konarak Road located of the facilities of the base use. نظر to the airport in the military area, located. just the information about the ... to the Hall of flight relating to free zone could weighed. and in the fields of electrical tower, care flight, this airport much information Get came. 1-2-1 power the airport: برق input from a post 20kv/400v with a transformer ground inside the substation with capacity of 630KVA being fed. مهمترین power consumption, this airport part of the facility and equipment ...

    • 9 Year
  • V94.2 gas turbine training course

    General start-up conditions: When the gas turbine is restarted after a long period of downtime (for example, after overhaul of the unit or important repairs that caused a large interruption in the work of the unit, or when the unit was out of service for a long time due to lack of need), the checks and visits mentioned in The following should be done. If the stoppage of the unit is short-term, such as normal stops on the weekend or short stops due to minor repairs, it is not necessary to do the things mentioned below (in order to prepare the unit). MBV lubricating oil system • Check the ...

    • 9 Year
  • Engineering, contract management, manufa...

    Knowledge based company, pyramids technology, Lightning as a contractor with the aim of implementation of industrial projects as EPC in the arena of Mineral Industries, Water and Wastewater, Oil, Gas, Refining and petrochemical, contract management, manufacturing and supply of goods and equipment, repairs, Basic Industries, Power Plant, etc. refinery and petrochemical industries, including blades and parts, track, hot, gas turbines, etc., steam and combined cycle activities can be.Company, pyramids technology, Lightning determined that your services with the best quality in the shortest time h ...

    Price: 9,126,717,215 IRT
    • 9 Year
  • Bitcoin and Minero mining electricity su...

    Electricity supply to miners According to the current situation where the supply of electricity to miners has become very difficult and difficult, the main concern of mining activists in Iran is the supply of electricity to their farms in the future. These days, the news indicates that the government and parliament are planning to export mining electricity tariff, which is more expensive than the commercial tariff. In this situation, the profitability of miners is greatly reduced and even in some situations it may be a loss. It is diesel, since diesel engines are suitable for emergency applic ...

    • 9 Year
  • Types of motors and generators, gas CHP...

    Reciprocating engines, some sort of technology for distributed generation of electricity is considered to be the same سیستم of gasoline engines and گازوییلی vehicle design and are made . Builders of such engines دارای high volume production, and therefore the base price-per-kilowatt production of electricity by this technology, in the پایین the most competitive level, is located. This generating has the efficiency relative high of about 35 % to 45 % have been to for various applications, including courier, shaving, etc. working mode backup and permanent, and also the cogeneration of electricit ...

    • 9 Year
  • Necessary documents for signing the cont...

    Necessary documents are: 1- Contract request letter 2- Alpha letter 3- Confirmation of network connection 4- Environmental approval 5- Land documents with industrial use 6- Technical specifications of the power plant including road map and access-Summary of study Energy source assessment-Specifications The main equipment of the power plant - Lay August 7 - Schedule of construction of the power plant 8 - The amount of energy produced 9 - Construction permit and extension of the initial commitment letter GAS Engine-Turbine and wind and solar power plants installation and commissioning, as well ...

    • 9 Year
  • The increase of selling price of electri...

    The price of electricity power stations renewable rose

    • 9 Year
  • New legislation the Ministry of energy a...

    The Ministry of Energy recently during a letter(the attachment) to manage the power plant no, and gas companies, ordered to the company no and Company, gas requirements necessary for the power plants own consumption(in the case of an island) and the supply of gas engines, they are to create. موتورهای reciprocating some sort of technology for distributed generation of electricity is considered to be the same سیستم of gasoline engines and گازوییلی vehicle design and are made . Builders of such engines have high volume production, and therefore the base price-per-kilowatt production of electricit ...

    • 9 Year
  • Three methods of generating electricity...

    Plan profitable production of electricity in Iran (three optimal method) 1-the construction of power plants, CHP: انرژی electric manufacturing generating, depending on the efficiency of between 90 and 110 USD بازای any کیلوواتساعت purchased the contract of purchase Guarantee up to 5 years concluded will. صورتوضعیت the electricity produced on the floor Dion were busy and at the end of each month to the company, NRI send and in less than 15 days by the company, be paid. Income اخالص monthly electricity sales productive 1مگاواتی: 70 million USD per month. 2-power generating from recycling he ...

    • 9 Year
  • Industrial plant design

    Designing various parts of industrial plants using ETAP software, including analysis of load distribution and short circuit, sizing of equipment (cable, switch, transformer), analysis of engine start-up in static and dynamic conditions, sizing of diesel generator and transformer, harmonic analysis and filter sizing, DC analysis (load and short circuit) and battery sizing, ground system, current adjustment of switches and relays

    • 9 Year
  • Equipment, instrumentation, engine G3520...

    Electric motor, the direction of the starter with a voltage of 23 volts, and stream 115 amps سوییچ magnetic voltage 24 VDC, and flow, 1.3 amps DIsconnect Switch with the flow of the illustrious 1000 amps and 0.3 volts سنسور temperature Operating Temperature 40 - to 120 degrees and voltage is 4.5 volts سنسور temperature(thermocouple) With average performance of 40 - Eli 1095 degrees Celsius سنسور temperature with the average performance of the 40 - Eli 125 degrees centigrade, and the voltage of 5 V DC and the flow of 10 MA سنسور pressure سنسور pressure with average performance of 40 - Eli 125 ...

    • 9 Year
  • طرح نیروگاه گازی و طرح توجیهی ساتبا با...

    تهیه لای اوت نیروگاه و مدارک مهندسی نیروگاه: لیست مذارک مهنذسی برای احذاث نیروگاه گازی: 1 مذارک بخش فراینذ - 1- Process basis of design 2- Power plant PFD 3- Power plant p & ID 4- Utility consumption list 2 مذارک بخش - piping 1- Piping material specification 2- Piping arrangement 3- Piping isometric drawing 4- Pipe support drawing 5- Power plant plot plan 6- MTO for piping material 7- Line list 8- Line sizing calculation مدارک بخش مکانیک - 1 Mechanical data sheet for Genset package 2 Mechanical technical specification 3 MTO for mechanical equipment 4- Datasheet for absorption chiller 5- D ...

    • 9 Year
  • Descirption of services, tests, pre-comm...

    Introduction تمام electrical equipment of power plant such as generator and motor, and the panels have to breakdown about the test and review The بگیند., the major tests required in the list below have been brought. 1-generator and system stimulation 1-1-resistance test .. game, play online 1-2-Test insulation resistance Tester(test from) 1-3-test surge 1-4-test Pat 2 - equipment and installations هدف from this test to ensure correct operation of other equipment and installations existing in the system. In this test, many parts of the system that there is a defect in any one of them could b ...

    • 9 Year
  • Finance powerhouses, and the investment...

    How to foreign investment, نحوه financing and the preparation of the budget the executive necessary to carry out infrastructure projects and operation of the products, services, make sure they now as one of the most important challenges facing developing countries can be. According to the specific situation of developing countries and the financial crises in these countries the possibility of supplying the capital needed to run the project easily not provide it. therefore, the choice of method of financing appropriate in the case of projects the issue is an important in many projects due to is ...

    • 9 Year
  • Engineering documents required for the c...

    This company has the ability to produce all the following documents completely: 1 Electrical document  Basic design • Equipment Data Sheets and Technical Specifications. • P&I diagram for the system. • Calculations for cable sizing according to the site conditions. • Power distribution scheme. • Controls, instrumentation, alarms and protection scheme and write up. • Over all key single line diagram (Detail Design) • MV switchgear single line diagram • Main LV switchgear single line diagram • MV switchgear data sheet • LV switchgear data sheet • Main transformer data sheet • ...

    • 9 Year
  • Connection scheme to the network, power...

    The power plant of Karun 3 نیروگاه Karun 3 has a synchronous generator with vertical axis is . Section قظعات about the needs of this project by domestic enterprises, such as Machine Sazi Arak and pars generator and هدکو under the supervision and support of the Austrian company that made the Bayshore 90% components made construction inside which the remaining 10% due to the techniques in the process of building from Austria, imported. ژنراتور has two major parts and basic can be one rotor and the other stator diameter rotor in the power plant, 2/9 km and has a diameter of stator 13 km, which ...

    • 9 Year
  • Descirption of the services monitoring t...

    1 - introduction: contains a review and provide a report regarding the following: ♦ standards and guidelines Sana and NRI ♦ rules and regulations of the country in the field of photovoltaic energy ♦ rules of procedure sale of electricity ♦ key points regarding the priorities (on the basis of regulatory approvals) in the field of choosing the location of the implementation of the project include: • areas of special, free, tourism, disadvantaged, and ... • support sharing state • optimum capacity of power plant from the perspective of Economics, Engineering, 2 - review the position of enviro ...

    • 9 Year
  • Classification of the motor generator کت...

    Categories engines, Caterpillar موتورهای Caterpillar in several types are produced. Engines کاترپیلاری that in order to use in generating the driving force have been designed in terms of division in the old series ۳۰۰ with the letter D for diesel fuel, and G for natural gas fuel specified were like: D398,D379, that in devices, the drilling of the sea and dryness of the application are or G379,G399. اما in the division other Caterpillar engines by series of different standings are in each series, the technology is newer compared to the series previous work is gone. Like the series ۳۳۰۰ and ...

    • 9 Year
  • Announcing the new rates of purchase of...

    Secretary of energy Dear Mr. اردکانیان in a letter to the NRI the rate of new electrical power plants, small-scale gas in the year 98 have declared. According to this letter in June 98, the purchase price of electricity from power plants, small-scale equal to 259 USD industry. https://www.instagram.com/solardg_iranian/ dgsolar.ir

    • 9 Year
  • The cost of constructing solar power pla...

    A common method of transferring electrical energy to the consumer in recent decades, mainly power generating in power stations; increasing the voltage to the extent desirable by Transformers to reduce transmission losses, transmission of electrical energy through lines elongated up near the consumer, and finally one or several stages, reducing the voltage to feed the consumer can be. With the increasing amount of demand for energy, electric restructuring in the electricity industry and also increase the efficiency of small manufacturing units, etc. power companies tend more to propel the subsc ...

    • 9 Year
  • The cost of constructing solar power pla...

    A common method of transferring electrical energy to the consumer in recent decades, mainly power generating in power stations; increasing the voltage to the extent desirable by Transformers to reduce transmission losses, transmission of electrical energy through lines elongated up near the consumer, and finally one or several stages, reducing the voltage to feed the consumer can be. With the increasing amount of demand for energy, electric restructuring in the electricity industry and also increase the efficiency of small manufacturing units, etc. power companies tend more to propel the subsc ...

    • 9 Year
  • The income of a solar power plant

    A common method of transferring electrical energy to the consumer in recent decades, mainly power generating in power stations; increasing the voltage to the extent desirable by Transformers to reduce transmission losses, transmission of electrical energy through lines elongated up near the consumer, and finally one or several stages, reducing the voltage to feed the consumer can be. With the increasing amount of demand for energy, electric restructuring in the electricity industry and also increase the efficiency of small manufacturing units, etc. power companies tend more to propel the subsc ...

    • 9 Year
  • Preparation of engineering documents for...

    Having a strong and experienced electrical engineering department, this company has the ability to carry out engineering phases, including feasibility studies, conceptual, basic and detailed design of the electrical department of the operating units of the oil, gas and petrochemical industries. Below is a brief description of the engineering department services. Electricity is provided.\r\n Design and engineering consulting\r\nWith the technical capabilities and valuable experiences of experienced experts and efficient technical forces, this company is able to provide all engineering services ...

    • 9 Year
  • Electricity supply for miner and bitcoin...

    Farm mining electricity supply According to the current situation where the supply of electricity to miners has become very difficult and difficult, the main concern of mining activists in Iran is the supply of electricity to their farms in the future. These days, the news indicates that the government and parliament are planning to export mining electricity tariff, which is more expensive than the commercial tariff. In this situation, the profitability of miners is greatly reduced and even in some situations it may be a loss. It is diesel, since diesel engines are suitable for emergency appl ...

    • 9 Year
  • Arrester Lightning Power Design and Desi...

    The company is done by the company for more information at 09126717215. Calling is one of the most beautiful and harmful phenomena, but at the same time harmful and harmful. Given the power that this phenomenon enjoys, it certainly causes many damage to nature and human artifacts, both financially and laterally. Therefore, recognizing this essential phenomenon and the methods of dealing with it and preventing its effects is of particular importance. Why installed lightning? The destructive effects of lightning are either caused by direct lighting collision or due to the inductive voltage ...

    • 9 Year
  • هزینه احداث یک نیروگاه خورشیدی و درآمد آ...

    روش متداول انتقال انرژی الکتریکی به مصرف کننده ها در دهه های اخیر عمدتاً تولید توان در نیروگاه های بزرگ، افزایش ولتاژ تا حد مطلوب توسط ترانسفورماتورها به منظور کاهش تلفات انتقال ، انتقال انرژی الکتریکی از طریق خطوط طویل تا نزدیکی مصرف کننده ها و در نهایت یک یا چند مرحله کاهش ولتاژ برای تغذیه مصرف کننده ها می باشد. با افزایش میزان تقاضا برای انرژی الکتریکی ، تجدید ساختار در صنعت برق و نیز افزایش راندمان واحدهای تولیدی کوچک ، شرکت های برق تمایل بیشتری برای سوق دادن مشترکین به سمت تولید محلی برق و تامین مصارف خود دارند . خصوصی سازی صنعت برق و توسعه انرژی های تجدید پذیر از مهمترین عوامل گسترش این ...

    • 9 Year
  • Farm Miner, Bitcoin and Mining Power Sup...

    Power supply, Miner supply, Bitcoin power supply, electricity Bitcoin, Bitcoin, Miner, Gas Power Plant, Power Farm, Miner Farm, bitcoin, Connection Confirmation, Connection License, Network Connection, Solar Power Plant, Solar

    Price: insta:solardg_iranian
    • 9 Year
  • Necessary steps to obtain customs exempt...

    To obtain customs exemption, the following two steps must be done: a. Register on Behin Yab site and upload the relevant documents, including: 1. Construction permit valid 2. Proforma (specify the model of the device and the year of manufacture and the economic number of the seller) ‌ 3. Price Packing list (Full description of product details along with their price) 4. Commercial invoice 5. Load 6. Register the order 7. Warehouse receipt 8. Device catalog and all its accessories 9. Currency sale announcement (if available) b. Letter of application for ...

    • 9 Year
  • Announcing the new rate of purchase of e...

    Regional electricity was announced. The average annual price of guaranteed electricity for small-scale power plants (DG) without CHP is 630 Tomans per kilowatt hour. According to the following figure, the letter is attached. Instagram: Solardg_iranian

    • 9 Year
  • Documents required for concluding a guar...

    Power (regional electricity) to sell electricity to distribution or regional electricity under the law of small scale power plants (distributed generation) DG, CHP and CCHP Power plant license: 1- Mossadegh image (equal to the original) Company Articles of Association (Delivery to the executor and the affairs of the contracts) 2 - Copy of the establishment announcement, copy of the last announcement of the official newspaper changes and copy of the official newspaper advertisement that specifies the members of the board of directors and the signatories of the binding documents. Affairs of ...

    • 9 Year
  • Combining the amber production area (pro...

    with his doctor in electricity, he has enough knowledge in the field of combining and occupying gas (turbines and coolants on the floor and the floor on the floor Production of DG board, drilling or new. 1. Public imitation of the solar arch area and special flight effort for the interior under the degree of variable and dirty heat \\\\ 2. To learn the quality of arranging and compiling the sequential / parallel classes according to the characteristics of the unified axis and the different types of arrangements without the option of the axes \\\\\\ \ \\\\\\ 3. Namzja ...

    • 9 Year
  • Selling PSS/E34 and PSS/E 35, PSSE 36 an...

    In this post, the free download link of PSS/E 33 software is placed for free so that students and professors can use and download it for free.\r\n \r\nTo buy PSS/E 34 and PSS/E 35 software, contact PSS/E 36 at 09126717215.\r\nIn this post, we intend to introduce and download the Siemens PSSE software from Siemens. Since its inception in 1976, this software has entered the field of power system simulation. PSSE software was designed in PTI company of America and is currently used in more than 50 countries. Powerful and complex computing algorithms in this software have turned it into a reliabl ...

    • 9 Year
  • Doing ground system calculations with Cy...

    The company performs all the calculations of the ground system with Cymegrd or ETAP or CYMCAP or CDEGS 17 or PLSCADD V16.81 or DigSilent2024 or Dehn. If needed to purchase Dehn, CDEGS, CYMGRD, CYMCAP, PLSCADD or DigSilent2024, call 09126717215. \r\nThe word CDEGS, which stands for Current Distribution, Electromagnetic Fields, Grounding and Soil Structure Analysis, is a powerful set of integrated software designed to accurately analyze the types of electromagnetic issues that occur in all industries including electrical networks. CDEGS software offers advanced solvents to solve the above proble ...

    • 9 Year
  • CYMGRD 8 and CYMCAP, CDEGS and DigSilent...

    Do the land system calculations with Cymegrd8 and Cdeegs- Saying Sim Grade 8 and CDEGS17 and Digsilent2024 and Dehn Cymcap without limitation and number of usernames to your liking \r\n\r\nContact 09126717215 if you would like to purchase CYMGRD8 or CYMCAP or CDEGS or PLSCADD or CDEGS 17 and Digsilent 2024. In this post, the free download link of Cymgrd 6.3 for the use of engineers and students.\r\n The company performs all the calculations of the land system with Cymegrd8 or ETAP20 or Cdeegs software. \r\nCymgrd is a software for designing and analyzing the ground connection system to help e ...

    • 9 Year
  • Designing lighting, sockets, antennas an...

    Dialux software introduction: One of the free and popular software in the field of lighting engineering design and lighting of construction projects is Dialux software. This software is available in 25 different languages. And it has more than 700 thousand uses. The main factor of using Dialux software in design is to match the result for lighting every place with global standards. The use of this software is also very common in the country. Because it is possible for lighting equipment manufacturing companies to put the technical information of their products as a plug-in in Dialux software ...

    • 9 Year
  • Training and projecting with software 33...

    In this post we are going to provide you with Siemens PSE software from Siemens to introduce and download. This software has been in the power system simulation since its inception. PSE software is designed by PTI USA and is currently used in more than 50 countries. Powerful and complex computational algorithms in this software have made it a reliable tool for modeling, analyzing and planning extensive power systems.\r\nPSS/E or PSSE software can be used in various cases such as simulation, analysis and optimization of power system performance. Other features of this software include the abili ...

    • 9 Year
  • Design, production and preparation of di...

    This company, having strong and experienced departments of electrical and mechanical engineering and instrumentation, has the ability to perform engineering phases including feasibility studies, conceptual, basic and detailed design of the electrical part of the operational units of the oil, gas and petrochemical industries, which are listed below. A brief description of the services of electrical engineering departments is provided. Regarding the production and preparation of engineering documents for diesel generators and the design of electrical and mechanical parts and precision instrumen ...

    • 9 Year
  • Documents required for solar power plant...

    S.No. Layout and General Arrangement Drawings Description\r\n1 Overall Plant Layout\r\n2 Water Distribution Pipeline Layout\r\n3 Storm water drainage layout\r\n4 Internal road layout\r\n5 CCTV camera layout\r\n6 Overall Plant Grading and Leveling Plan\r\n7 Foundation Marking Plan\r\n8 Cable Trench Layout (indicating Details of cable route for Power &\r\nCommunication Cables)\r\n9 Layout of Inverter & Transformer block (Inverter Stand)\r\n10 Layout for Balance of Plant systems, (Weather Stations, Earthing, Lightening\r\nprotection, surge protection etc.)\r\n11 Bill of Material for Mecha ...

    • 9 Year
  • PSS/E36 and PSS/E 35 and Cymgrd8, Cymcap...

    PSS/E36 and PSS/E 35 and CYMGRD8, Cymcap, Dehn, CDEGS, PLSCADD, DigSilent 2024, ETAP22.5\r\nSell call 09126717215 for purchase.\r\n\r\n\r\nThe company performs all the calculations of the land system with Cymegrd or ETAP or CYMCAP or CDEGS 17 or PLSCADD V16.81. Call 09126717215 if needed to purchase Dehn, CDEGS, CYMGRD, CYMCAP and PLSCADD. \r\nThe word CDEGS, which stands for Current Distribution, Electromagnetic Fields, Grounding and Soil Structure Analysis, is a powerful set of integrated software designed to accurately analyze the types of electromagnetic issues that occur in all industries ...

    • 9 Year
Buy offers