Connection scheme to the network, power plant, Karun

Contact with the company Start order
  • Gold
  • 7 Year

Connection scheme to the network, power plant, Karun


The power plant of Karun 3

نیروگاه Karun 3 has a synchronous generator with vertical axis is . Section قظعات about the needs of this project by domestic enterprises, such as Machine Sazi Arak and pars generator and هدکو under the supervision and support of the Austrian company that made the Bayshore 90% components made construction inside which the remaining 10% due to the techniques in the process of building from Austria, imported. ژنراتور has two major parts and basic can be one rotor and the other stator diameter rotor in the power plant, 2/9 km and has a diameter of stator 13 km, which is generally the height of the overall 8/7 meters. میدان magnetic in the rotor created and in the sheen of the stator-inducing gets, and through باسداکت to the transformer can be moved. ICON in the power plant of Karun 3 generator has a characteristic, the following is 260 MVA power output of the total generators : 75/15 KV : voltage output, name it 50 Hz frequency name : 187/5 RPMسرعت name : وزن the whole generator : 980 tons وزن rotor : 570 tons وزن stator : 270 tons محور interface the connection between the runner of the turbine and the rotor is responsible for the action of positioning, by bearing the main takes place, which oil planning of the friction between the surfaces and the surface to reduce the oil through the radiator, cooling is water cooled, because of the large size and enormous weight action Assembly in your plant is done. اسکلت the main rotor is a big piece that is to the rotor spider, it is said that a steel shaft rotor that surrounds, after assembly in the factory, to the workshop can be transmitted at a later stage, the core of the Chinese rotor begins this stage is one of the most sensitive stage file after the core of Chinese install rims Bolt begins and آچارکشی can be then tests the rotor on it, done the practice test, the heat to ensure the amount of expansion in the rotor is روتور as a piece Wheeler on generator two, the main task is responsible for یکی maintenance of Poles provoke AND create another path of resistance, the bottom for the passage of magnetic flux بعد from the steps above the pole of the rotor groove on embedded placed. ICON thermal power plants, poles, power plant, usually a pair can be, but in hydroelectric power due to low wind speed number of Poles is far more is that the poles in power plants, Karun 3 , 32 PCs can be to همیین because the diameter of the generator in hydro power plants further from thermal power plants is after the installation process the insulation of the rotor is done testing the voltage above the excitation coil can be done in the experiments 2500 volts to the coil are given . پس from this point, the fan for cooling the Assembly after rotor assembly in the workshop of this piece, to transfer to Pitt generator is ready after the process of assembling the rotor turns to the process of assembling the stator in the meta, it seems مراحل Assembly of the stator is very similar to the rotor can be, with the difference that the stator directly in the Pitt generator assembly can be. استاوتور has two main role is : یکی collect the voltage induced in the sheen of your AND create another path of resistance, the bottom for the passage of magnetic flux can be. ICON in the meantime, should possess the power, mechanical and electrical necessary for the bearing flow, the transient need be . بعد of the final frame, the stator action استیکینگ core on it takes place to provide cool operation storage intervals necessary on some rings for ...

Azarakhsh Technology Pyramid Company

  • Gold Company
  • Trusted Company
  • Company registration date: 2003-03-21
  • Number of staff: 1-10 Person
  • Company activities: producer, Trading Company, Service company
  • Place: Iran, Province Tehran
  • In the field of: machinery
  • Company Type: Private

Azarakhsh Technology Pyramid Company has a lot of experience in the field of design, construction, supply and construction of solar and small scale power plants. It also has many traders in receiving and obtaining licenses for solar power plants and DG, such as land license, environmental license, network connection approval license and technical approval from Tarasht power plant, and connection license from SATBA, etc. The company can also provide all the engineering documents of power plants such as electrical design drawings and precision drawings, LV and MV panels, sensors, motors, compressors and turbines and structures of equipment and solar panels, inverters, charger controllers, diesel generators and gas engines. Produce. \\ r \\ n. \\ r \\ n. \\ r \\ n Contact us 02144221118--09126717215

Contact Info
Companyشرکت اهرام فناوری آذرخش
Tel +98 21-0×××6717215 callMake Call
Mobile +98 912×××7215 callMake Call
Whatsapp Whatsapp link
Instagram Instagram page
Website http://www.dgsolar.ir
CountryIran
ProvinceTehran
Addressخ ستارخان روبروی برق الستوم-پلاک 790
Send pm Company Profile
سوالات متداول

آیا در مورد این محصول سوالی دارید؟

The latest products in this category