Power supply bitcoin and ماینرو ماینینگ only through the construction of gas power plant DG and CHP ...

Contact with the company Start order
  • Gold
  • 7 Year

Power supply bitcoin and ماینرو ماینینگ only through the construction of gas power plant DG and CHP ...


Power supply ماینرها با attention to the current conditions that the power supply ماینرها very hard and difficult is. the main concern of activists ماینینگ in Iran electric supply, farm in the future. These days the news showed that the government and parliament intend to electricity tariffs of Mines, to export them. that the tariff in terms of price of the commercial time more expensive all the IS. In these conditions, the rate of profitability ماینرها very reduce Shere, and even in some circumstances, may warns of another annual loss to be.( According to half of the bonuses bitcoin in the year 2020 devices a lot of losses, ten are) so the only way to supply electricity ماینینگ use generators, gas or diesel, is different. whereas diesel engines for applications امرجنسی appropriate and not uses 24-hour, therefore, the only suitable option for electricity ماینرها the use of engine-generators gas industry. ژنراتور gas burner یکی method power supply ماینرها the use of gas-fueled generator is. Generator, gas burner, as the name suggests, from of city gas or cylinder to generate power uses this type of generator has several variants . Considering that ماینرها devices پرمصرفی are and when you speak of the farm is so to a variety of capacity on top of it, we refer this type of generator from the gas engine and a generator form, which is energy derived from burning gas to rotate a generator and produce electricity uses. Generator gas on two different types of Industry:1-gas turbine 2-engine reciprocating(Reciprocating) gas توربین gas from the blades and the compressor and the intake and ... formed that, in effect, clash of the hot gas output of the compressor to the turbine blades spin created and the shaft of the generator is rotated and electricity is produced and the efficiency of its Nast, to the motor, the reciprocating lower and is, therefore, to produce a limited amount of electricity, gas, more than to motorbike using. For example, a turbine TB5000 for the production of a MW power of 400 cubic meters per hour of gas میسوزاند. Famous brands in the field of turbine GE and Siemens, which are engines turbine available in Iran, most of Siemens, respectively. such as the SGT600 and SGT400 and ..... موتور gas, or Gas Engine, which through the Moving, went to the playoffs the Pistons and converts it to rotary motion of the crank shaft, generator test, and the electricity produced. In recent years, strongly welcomed نیروگاهداران located, and from 100 kW to 12 MW by different brands produced and has a yield much higher and less price and operation cost and lower operation relative to the turbine industry and famous brands that include Caterpillar and MTU and جنباخر and MWM and MAN gas consumption, they are for MW 250 مترکعب On hours and with a yield of 42% as the gas pressure input engine 10 to 34 کیلوپاسکال is from the pressure of Urban have a lower need to ردیوسر there. to install, and operation of a power plant or generator, the gas in the first place should be from the Ministry of energy and gas companies the license to get the gas required by the engine to supply the requirements. in recent months, only a license and a contract that NRI to generators gas gives the famous to the contract 310 is in spades the summer of electricity to the price of the KW hour 350 of investors buys. Therefore, in the first direction of the power supply ماینینگ Your have license 310 of the Ministry of energy consider that routine it into several stages is divided. 1-agreement from the distribution company or on ...

Azarakhsh Technology Pyramid Company

  • Gold Company
  • Trusted Company
  • Company registration date: 2003-03-21
  • Number of staff: 1-10 Person
  • Company activities: producer, Trading Company, Service company
  • Place: Iran, Province Tehran
  • In the field of: machinery
  • Company Type: Private

Azarakhsh Technology Pyramid Company has a lot of experience in the field of design, construction, supply and construction of solar and small scale power plants. It also has many traders in receiving and obtaining licenses for solar power plants and DG, such as land license, environmental license, network connection approval license and technical approval from Tarasht power plant, and connection license from SATBA, etc. The company can also provide all the engineering documents of power plants such as electrical design drawings and precision drawings, LV and MV panels, sensors, motors, compressors and turbines and structures of equipment and solar panels, inverters, charger controllers, diesel generators and gas engines. Produce. \\ r \\ n. \\ r \\ n. \\ r \\ n Contact us 02144221118--09126717215

Contact Info
Companyشرکت اهرام فناوری آذرخش
Tel +98 21-0×××6717215 callMake Call
Mobile +98 912×××7215 callMake Call
Whatsapp Whatsapp link
Instagram Instagram page
Website http://www.dgsolar.ir
CountryIran
ProvinceTehran
Addressخ ستارخان روبروی برق الستوم-پلاک 790
Send pm Company Profile
سوالات متداول

آیا در مورد این محصول سوالی دارید؟

The latest products in this category