There are no comments for this product
[# bms smart room system server#](https://pishrans.com/%D8%A7%D8%AA%D8%A7%D9%82-%D8%B3%D8% 25B1%D9%88%D8%B1-%D9%87%D9%88%D8%B4%D9%85%D9%86%D8%AF)
In this system, there will be a logical definition in the output according to practically every error so that the problems can be solved as much as possible without the presence of human resources. These errors can be things like the following.
1) The temperature increases
After turning on the siren and sending an SMS, the reserve cooler will be turned on in the network and if the temperature does not decrease with the reserve cooler, it will send an alarm to the manager of critical conditions.
2) humidity increases
This happens very rarely, because the increase in humidity is generally done by cutting off the cooling system, and according to calculations, the trend of humidity changes in a system will be a downward trend with an increase in temperature, so this case is practically ruled out, but the presence of a humidity sensor is a security factor for a higher level of protection in the system.
3) The network power is cut off
In this case, after sending the warning, if there is a generator or UPS system for cooling, it will start cooling.
4) Water leaks
In very large systems where the cooling function is a water circulation process, water leakage can cause the destruction of the entire system, and if there is a water leak, it can shut off the water inlets and outlets from the desired location so that the leakage does not cause damage, and at the end, it will automatically cut off the electricity of the entire server room from the source (the main fuse) so as not to cause a connection.
5) System electricity is 2 phase
In 3-phase industrial equipment such as UPS and similar, 2-phase network can lead to UPS burning, which can be neutralized and ineffective by cutting off the entire network power.
6) The single-phase network becomes 2-phase
In some cases, due to a connection in the high voltage power lines, the neutral wire is also electrified and 380 V electricity enters the network. This can cause severe damage to all input components such as UPS and devices that are connected to the main power network. If this happens, the power input to the system must be cut off without delay.
7) Unauthorized access to the network is done
In this case, after activating the siren and sending the SMS, the system should practically stop the unknown person who can close the electrical outlet or entrance.
8) Sudden increase in temperature in the place
If this happens, it has irreparable consequences and indicates the occurrence of a fire in one or more places, which should be immediately disconnected from the electrical network without delaying the electrical systems of the server room, and the air production parts should be turned off, so that the lack of oxygen helps to reduce the fire.
9) Sudden increase in humidity in the place without lowering the temperature
This factor happens when the cooling of the server room, which includes the split, gets clogged and the water created in the coolers is thrown into the air by the coolers themselves, which sometimes spills on the racks and causes burns and heavy damage to the equipment.
In intelligent server room systems, cooling control and moving compressors to reduce
There are no comments for this product
| Company | پیشران صنعت ویرا |
|---|---|
| Tel | +98 21-4×××3681, +98 21-4×××5128, +98 21-4×××5809, +98 21-4×××583 |
| Whatsapp link | |
| Instagram page | |
| Telegram | Telegram link |
| Website | http://www.pishrans.com |
| Country | Iran |
| Province | Tehran |
| Address | تهران –بزرگراه ستاری جنوب به شمال-بعد از حکیم –نبش کوچه اسدی –پلاک41 –واحد 10 |
Jooyeshgar AI Assistant