Dear user, the ad you are about to view has expired. We suggest you visit the titles and ads related to this ad.

1. Testing and commissioning of switchgear and سوئیچگیر MV , LV (testing equipment, and circuits). 2 ...

  • View: 1924
  • updated: 08 Nov 2016
  • Expire: Thursday 08 Nov 2018 (Expired)
  • Last Login : 08 Nov 2016
  • The possibility of a response from the seller is low.
    Register a purchase request and ask other sellers.
Contact with the company Inventory check
  • 7 Year

1. Testing and commissioning of switchgear and سوئیچگیر MV , LV (testing equipment, and circuits). 2 ...


  1. Testing and commissioning of switchgear and سوئیچگیر MV , LV (testing equipment, and circuits).
  2. Testing, testing and commissioning of high voltage substations (test equipment and circuitry and protective relays).
  3. Test and way اندازیانواع generator.
  4. Different types of electric MV , LV (testing, vibration and insulation resistance tester, etc.).
  5. Installation of the transformer (test group operation and the insulation resistance tester and conversion ratios, and short circuit, etc.).
  6. Test and service the annual electricity posts (and سوئیچگیر and دیژنکتور and ....).
  7. Test meters, digital and analog.
  8. 8-testing and commissioning, relay, PRIMARY , SECONDARY
  9. Installation of the regulator Bank, Capacitive.
  10. Testing and commissioning ترانسدیوسرهای voltage, temperature, and flow and ....
  11. Test the earth system and measure resistance to earth and resistance of the special soil http://www.saina-energy.com

Saina company energy

  • Company registration date: -
  • Number of staff: 1-10 Person
  • Company activities:
  • Place: Iran, Province Yazd
  • In the field of: Instrumentation and Automation
  • Company Type:

1. Testing and commissioning of switchgear and سوئیچگیر MV , LV (testing equipment, and circuits).
2. Testing, testing and commissioning of high voltage substations (test equipment and circuitry and protective relays).
3. Test and way اندازیانواع generator.
4. Different types of electric MV , LV (testing, vibration and insulation resistance tester, etc.).
5. Installation of the transformer (test group operation and the insulation resistance tester and conversion ratios, and short circuit, etc.).
6. Test and service the annual electricity posts (and سوئیچگیر and دیژنکتور and ....).
7. Test meters, digital and analog.
8. 8-testing and commissioning, relay, PRIMARY , SECONDARY
9. Installation of the regulator Bank, Capacitive.
10. Testing and commissioning ترانسدیوسرهای voltage, temperature, and flow and ....
11. Test the earth system and measure resistance to earth and resistance of the special soil

Contact Info
Companyشرکت ساینا انرژی
Tel +98 35-3×××0398 callMake Call
Mobile +98 913×××6884 callMake Call
CountryIran
ProvinceYazd
Send pm Company Profile
سوالات متداول

آیا در مورد این محصول سوالی دارید؟

The latest products in this category