Pars, template, provider, system, trail run, concrete ceiling System drop of the slab In the system drop of the slab, it is possible that two to three days after the operation, concreting etc. all the tools under the roof, such as mold, overlying and dread form the To Non-of platforms on scaffolding or on the سرجک, and as soon as possible in the ceiling or project of another used. In fact, the system drop the slab, this will allow that instead of the form below the ceiling on the duration of twenty days from under the roof, outdoor. 99% of the tools (templates) after two days, the use of re-release. It should be noted that the possibility of the establishment of this system for the following beams are also possible and can be part of the template, below the beams, effortless, and merely the location where the scaffold or jack fall, the drying time of concrete (resistance to get) under the roof of the stay. Advantages:
System drop the slab in the Bureau of patents Registered, and any similar storage legal prosecution.
Design unique, based on the principles of Engineering with the best quality and in different dimensions The direction of orientation, complete with products to the website http://www.parsformwork.com visit or get in touch with us. Phone: 36635708-031 to 11 Fax: 36623393-031 Mobile: (At the bottom of the ad)
http://parsformwork.com
Company | شرکت پارس قالب |
---|---|
Tel | +98 31-3×××5708 |
Website | http://parsformwork.com |
Country | Iran |
Province | Esfahan |