Dear user, the ad you are about to view has expired. We suggest you visit the titles and ads related to this ad.

System drop - system, new roof, concrete - 36635708-031

  • View: 1000
  • updated: 22 Sep 2016
  • Expire: Saturday 23 Sep 2017 (Expired)
  • Last Login : 22 Sep 2016
  • The possibility of a response from the seller is low.
    Register a purchase request and ask other sellers.
Contact with the company Inventory check
  • 8 Year

System drop - system, new roof, concrete - 36635708-031


Pars, template, provider, system, trail run, concrete ceiling System drop of the slab In the system drop of the slab, it is possible that two to three days after the operation, concreting etc. all the tools under the roof, such as mold, overlying and dread form the To Non-of platforms on scaffolding or on the سرجک, and as soon as possible in the ceiling or project of another used. In fact, the system drop the slab, this will allow that instead of the form below the ceiling on the duration of twenty days from under the roof, outdoor. 99% of the tools (templates) after two days, the use of re-release. It should be noted that the possibility of the establishment of this system for the following beams are also possible and can be part of the template, below the beams, effortless, and merely the location where the scaffold or jack fall, the drying time of concrete (resistance to get) under the roof of the stay. Advantages:

  • Increase 6 to 7 parity run
  • Failure depends on the span of the roof
  • Safety in the installation and open the tool, and at the time of concreting
  • Return on investment in 6 to 7 roof
  • Install and دکفراژ easy
  • High quality of the Run, and the concrete final
  • Highest need facilities such as crane

System drop the slab in the Bureau of patents Registered, and any similar storage legal prosecution.

Design unique, based on the principles of Engineering with the best quality and in different dimensions The direction of orientation, complete with products to the website http://www.parsformwork.com visit or get in touch with us. Phone: 36635708-031 to 11 Fax: 36623393-031 Mobile: (At the bottom of the ad)

http://parsformwork.com

Pars form

  • Company registration date: -
  • Number of staff: 11-20 Person
  • Company activities: producer
  • Place: Iran, Province Esfahan
  • In the field of: Building Materials
  • Company Type: Private

Barking mold, manufacturer, crafts, and molding equipment, concrete
* Types of mould, concrete plastic
* Variety of templates, concrete, metal
* Types of mould, concrete پلای wood
* Types of mould concrete in a variety of modular (columns, ceiling, and wall)
* Variety of templates, concrete, rounded and arcuate (column-structures, round)
* Types of scaffolding modular (scaffold. scaffolding hammer, etc. trellis triangular and trellis traditional)
* Produces a variety of Jack roof and Jack back strap

Contact Info
Companyشرکت پارس قالب
Tel +98 31-3×××5708 callMake Call
Website http://parsformwork.com
CountryIran
ProvinceEsfahan
Send pm Company Profile
سوالات متداول

آیا در مورد این محصول سوالی دارید؟

The latest products in this category