Hye, schedule, management and control of the project under software :
Primavera 6 - Primavera 3 - Microsoft Office Project 2(At the bottom of the ad)
Whatever you need one would be:
Consultation and review the overall project
Scheduler, detailed, etc. macro, and. critical path project along the breakdown structure and Gantt chart chart.
Define calendars, seasonal and workshop for any type of activity, the direction of definition of efficiency based on different conditions.
Traced charts, network based scheduling.
Define اوازن physical - rials – weighted.
The allocation of credit in rials each activity.
The allocation of resources (machinery+manpower + materials) + volumes.
Extract tables, machinery etc., manpower and Materials needed the project to the breakdown of each month along with corresponding diagram.
The extraction table of the progress of the amount of unsubsidized expected the project to the breakdown of each month and the cumulative proportion to the progress of the project, along with graphs of the corresponding Cash Flow
Extraction tables, the activities of the major project to the breakdown of each month and cumulative for the progress of the project, along with their corresponding graphs.
The extraction of the table of physical progress - physical bitcoins - weighted project to the breakdown of each month and cumulative, along with the corresponding diagram.
صفحهبندی and adjust schedule, etc. tables, charts.
Approved program schedule.
Preparation of Wbs as a multiple - multi-dimensional -
Preparation of all monthly reports - ranging from the incidence of the project, report, video, etc. دراصد real and plan time, cost and physical
Preparation of estimation cost of the project
Other cases in the field of project management
Company | شرکت سید محمد رضوی |
---|---|
Tel | +98 -9×××242250 |
Country | Iran |
Province | Mazandaran |