Dear user, the ad you are about to view has expired. We suggest you visit the titles and ads related to this ad.

Procurement schedule-manage and control project

  • View: 989
  • updated: 14 Jan 2016
  • Expire: Saturday 13 Jan 2018 (Expired)
  • بصورت توافقی
  • Last Login : 14 Jan 2016
  • The possibility of a response from the seller is low.
    Register a purchase request and ask other sellers.
Contact with the company Inventory check
  • 8 Year

Procurement schedule-manage and control project


Hye, schedule, management and control of the project under software :

Primavera 6 - Primavera 3 - Microsoft Office Project 2(At the bottom of the ad)

Whatever you need one would be:

  1. Consultation and review the overall project

  2. Scheduler, detailed, etc. macro, and. critical path project along the breakdown structure and Gantt chart chart.

  3. Define calendars, seasonal and workshop for any type of activity, the direction of definition of efficiency based on different conditions.

  4. Traced charts, network based scheduling.

  5. Define اوازن physical - rials – weighted.

  6. The allocation of credit in rials each activity.

  7. The allocation of resources (machinery+manpower + materials) + volumes.

  8. Extract tables, machinery etc., manpower and Materials needed the project to the breakdown of each month along with corresponding diagram.

  9. The extraction table of the progress of the amount of unsubsidized expected the project to the breakdown of each month and the cumulative proportion to the progress of the project, along with graphs of the corresponding Cash Flow

  10. Extraction tables, the activities of the major project to the breakdown of each month and cumulative for the progress of the project, along with their corresponding graphs.

  11. The extraction of the table of physical progress - physical bitcoins - weighted project to the breakdown of each month and cumulative, along with the corresponding diagram.

  12. صفحهبندی and adjust schedule, etc. tables, charts.

  13. Approved program schedule.

  14. Preparation of Wbs as a multiple - multi-dimensional -

  15. Preparation of all monthly reports - ranging from the incidence of the project, report, video, etc. دراصد real and plan time, cost and physical

  16. Preparation of estimation cost of the project

  17. Other cases in the field of project management

The company Seyed Mohammad Razavi

  • Company registration date: -
  • Number of staff: 1-10 Person
  • Company activities:
  • Place: Iran, Province Mazandaran
  • In the field of: Consultation
  • Company Type:


Contact Info
Companyشرکت سید محمد رضوی
Tel +98 -9×××242250 callMake Call
CountryIran
ProvinceMazandaran
Send pm Company Profile
سوالات متداول

آیا در مورد این محصول سوالی دارید؟

The latest products in this category